Ango’na Solar Power Scheme
Construction Portfolio
Home > Divisions > Construction Division > Portfolio
Project Name: Supply, Delivery and Installation of solar system
Organization: Local Development Fund
Scope of Work: The project consisted of collected water from the source and transported to the flexible water tank. The water tank is 100m³. Centrifugal pumps are supplied and installed on site to transport the water to the end user. The system is totally operated using solar energy. Solar panels are supplied and installed. The system consists of supplying and installing solar lighting system, invertors and batteries.