Project Name: Construction and Improvement of Bangwe Water Supply System
Organization: Blantyre Water Board
Scope of Work: This project was distributed between 3 different lots. Lot 1 consisted of construction of operator office, sump with all the different pipe required and their fittings and supply and installation of new main distribution board for booster pump power supply. The construction of pump house with fence, gates and chambers with manhole cover. Lot 2 consisted of supply, erection and commissioning of galvanized pressed tank of 305 m³ on steel tower. Reinforced concrete foundation for the tower with fitting at inlet, outlet and washout. A bricked fence was constructed with steel fabricated gate and other structures such as valve chamber and drainage. Lot 3 included excavation, bedding and backfilling for all the pipeline works. This included construction of valves, washout chamber, reinforced concrete manhole cover and check dams.

Completion Certificate